TOP PHOTO: Sunday evening and Rogers Group is back on the job with trucks getting in position to start loading the milled up pavement.

Some of the equipment assembled and set in pre-dug holes at the developing Caryville Cares Playground.

LAFOLLETTE, TN (WLAF) – Paving and the ground work for a new business on the east side of Lafollette along with snapshots of the progress being made on the Caryville Cares Playground are featured in photos today from WLAF’s Charlie Hutson.

A look Friday evening at the future site of the Lafollette Dollar Tree as the ground prep gets underway.
Crews are milling the west bound outside lane near the post office on Sunday evening.
 Still a lot of equipment to be assembled and mounted at Caryville for the new playground.
A look at the site Sunday of this future business after a lot of earth was moved Friday and Saturday.
Here’s a look at some of the pre-dug holes for the legs of the play ground equipment at Caryville.
All the dirt is being stockpiled on site for future uses if needed.
A look at some of the pre dug holes for the legs of the play ground equipment

(WLAF NEWS PUBLISHED – 09/18/2023-6AM)

Leave a Reply

Your email address will not be published. Required fields are marked *